Full Building Envelope Caulking

Sealants are the building envelope's first line of defence — and field studies show half of all sealant joints fail by year 10. Full-building sealant replacement stops water at every window perimeter, precast joint, control joint and balcony interface at once.

Recaulking precast joints from a swing stage

Signs this is your building

  • Cracked, split, loose or missing caulking
  • Water leaks around windows or balcony doors
  • Drafts near exterior openings
  • Staining or deterioration around joints
  • Engineer recommendation for sealant replacement

Typical scope

  • Review of failed and aging sealant joints
  • Removal of deteriorated caulking
  • Surface preparation and priming
  • Professional-grade sealant installation
  • Photo documentation and closeout reporting

See it age: watch a caulking joint craze, crack, and lose adhesion over 40 years. Open the interactive building and drag the 40-year slider.

Find out what stage your joints are in.

Documented, photographed, and ready for your board or your engineer.

Book a 15-minute call